John J
 Veteran
    Posts: 272
Joined: 8/3/2010
Location: Leduc, AB
User Profile |
Hi Barry,
If I happen to update a TP under Edit->Trade Plan, it won't update any strategy which uses this TP as well. If I want to use the latest TP update in the strategy, I have to first deselect it and then reselect it under Trade Plan Source.
This is usually not a problem if there's just one strategy. However, with ATM one may have for instance 10 strategies. If I want to use the very same updated TP in all of them, the repeated deselect/reselect gets tedious. Would it be possible to incorporate a refresh button as described below?
[Edited by John J on 6/25/2018 3:57 PM]
Attached file : Capture.JPG (110KB - 651 downloads)
|